READINESS GATES

Readiness

Evidence-readiness gates and public-claim limits for This Air Quality Project reporting.

Current publication status

Source-collection integrity

Passed

Confirms current-data acquisition, provenance and quality-stage mechanics only.

Scientific episode release

Not Applicable No Evaluable Screen

0 screening event(s); required missing dimensions: none reported.

Acquisition status distinguishes primary monitoring evidence from mandatory contextual sources. A degraded context harvest may support a clearly labelled data-availability release, but not an environmental episode, source, compliance, exposure or health finding. No current environmental episode assessment was possible because no selected monitoring site met the freshness threshold. The newest accepted reporting-site observation was 11.7 hours old at collection. No fresh eligible episode was available for corroboration. Episode-level convergence was not applicable; configured join readiness is reported separately.

A green harvest gate is not a pollution-source finding. Source attribution, causation, permit breach, exposure and health conclusions remain prohibited unless the separate scientific gate passes.

Current release posture

1 mandatory stream gate(s) remain constrained. The public site reports verified acquisition and readiness without converting incomplete data into scientific claims.

See current limitations and evidence joins

Readiness status

Overall status: api_led_screening_and_evidence_convergence_not_source_determination

Public claim level: Screening and readiness notes only

Readiness dashboard

Source acquiredComplete primary measurements
Provenance recordedComplete current measurement provenance
Parser validatedQuality validated current measurements
Time alignment checkedNot applicable no fresh screening events
Monitor role checkedCandidate monitor roles unvalidated
Meteorology checkedOfficial observations available event alignment not applicable
Comparator checkedNot applicable no fresh screening events monitor roles pending
Reviewer challenge recordedClaim framework started

Evidence checks

This Air Quality Project data table 1
Comparator Checkednot_applicable_no_fresh_screening_events_monitor_roles_pending
Meteorology Checkedofficial_meteorology_acquired_no_event_alignment_not_applicable
Monitor Role Checkedcandidate_monitor_roles_unvalidated
Parser Validatedquality_validated_current_measurements
Provenance Recordedcomplete_current_measurement_provenance
Reviewer Challenge Recordedclaim_Framework started
Source Acquiredcomplete_primary_measurements
Time Alignment Checkednot_applicable_no_fresh_screening_events

Review requirement

A gate marked partial, context-only, needs-review, missing or not-ready must not be used as proof. It is a prompt for follow-up review and expert challenge.

How to read this page

Scientific evidence and software assurance are different

Scientific evidence

Measurements, station and regional coverage, descriptive calculations, source records and stated limitations are the evidence available for review.

Engineering assurance

Automated checks confirm that the pipeline followed its declared rules. They do not constitute peer review, accreditation, regulatory approval or institutional endorsement.